On May 4, 2024, Nam Trung officially began the site development for the Dooil TPS Vietnam Packaging Factory project, located at Lot B7, N6 Street, TMTC Industrial Park within the Moc Bai Border Gate Economic Zone, Ben Cau District, Tay Ninh Province.
The Dooil Factory Project spans a total area of 18,719 m², comprising the following main facilities and supporting structures:
Production Workshop: 10,657 m²
Office Building: 225 m²
Canteen Area: 450 m²
Parking Lot with Underground Firefighting Water Tank: 600 m²
Some perspective renderings and site preparation images of the project are shown below:







Tiếng Việt
한국어
中文 (中国)
日本語