The process of building a standard-compliant factory includes steps from planning, design, and construction to completion and handover. This process must comply with current technical standards and legal regulations while also updating new requirements for safety, environment, and energy efficiency. Let’s explore in detail with Nam Trung the standard process of factory construction.
Step 1: Site Survey and Planning
Surveying the terrain and natural conditions: Conduct geological, hydrological, and climate surveys at the proposed construction site.
Needs analysis and planning: Define usage objectives, factory scale, functions, and technical requirements. Prepare a preliminary plan including schedule, cost, and risk assessment.

Nam Trung engineers surveying the CSWind factory renovation & upgrade project
Step 2: Detailed Design Drawings
Architectural design: Includes detailed drawings of layout, structure, walls, roofing, drainage, and fire safety. In 2024, special focus should be given to eco-friendly and energy-saving designs.
Structural design: Calculate and select materials and construction methods to ensure sustainability and load-bearing capacity. This is one of the most critical steps in the factory construction process.

Nam Trung engineers drafting the structural design for the CSWind project
MEP Design (Mechanical, Electrical, Plumbing): Focus on electromechanical systems, water supply & drainage, HVAC, and other supporting systems. Emphasis on modern technology, automation, and renewable energy.
Step 3: Design Approval and Construction Permit
Design approval: Submit the design dossier for review and approval by authorities to ensure compliance with the latest regulations on construction, environment, and labor safety.
Construction permit: Prepare documents and apply for construction permits from government agencies, including environmental protection and fire safety approvals.
Step 4: Construction Preparation
Contractor selection: Tender or select contractors with proven capability and experience in factory construction according to modern standards.
Materials and equipment preparation: Ensure the supply of high-quality, eco-friendly materials that meet technical requirements. Prepare modern and safe construction equipment.
Chuẩn bị mặt bằng: San lấp mặt bằng, xây dựng các công trình tạm như văn phòng công trường, nhà ở Site preparation: Level the ground and build temporary facilities such as site offices, worker accommodations, and storage areas.
The preparation stage is crucial in the factory construction process. An experienced contractor will carefully prepare for the entire construction to ensure the overall schedule is met.

Temporary site office for Dooil factory project – Tay Ninh
Step 5: Construction Execution
Foundation construction: Excavation, piling, and foundation concreting according to design, ensuring quality and safety.
Structural frame construction: Erect steel frames or reinforced concrete structures, including columns, beams, slabs, and roofing.

Erection of steel frames for Dooil factory project – Tay Ninh
Walls and roofing: Build enclosure walls, install roofing, and complete the main structure. Use thermal insulation materials to reduce energy consumption.
MEP installation: Install electrical, water supply & drainage, HVAC, and other technical systems as designed, with emphasis on automation and energy savings.

Ventilation system installation for factory project
Step 6: Inspection and Finishing
Quality inspection: Conduct quality checks for each component according to standards, including structure, MEP systems, and safety compliance.
Finishing works: Install doors, paint walls, lay flooring, and other finishing works. Ensure aesthetics and user convenience.
Step 7: Acceptance and Handover
Project acceptance: Conduct final acceptance with participation of all stakeholders to confirm compliance with quality, safety, and legal requirements.
Project handover: The contractor hands over the factory to the investor after completing all works and meeting all technical requirements.

Mijack factory project ready for acceptance and handover (Package: Fabrication & erection of factory building)
Step 8: Maintenance and Servicing
Maintenance planning: Establish a regular maintenance plan to maintain the quality and performance of the factory.
Servicing: Carry out maintenance and repairs when necessary to ensure stable operation, energy efficiency, and safety.
The process of building a standard-compliant factory requires strict compliance with environmental, safety, and technological regulations, ensuring that the building not only meets technical standards but is also eco-friendly and cost-optimised in operation.